Wednesday, October 22, 2008

Kenmore 110.92282100 Capacity

Comply With President

The city of' Giugliano thanked Prime Minister Silvio Berlusconi, his subjects and, with them, Mayor John Pianese for thinking once again to our territory as a place that must 'accommodate the fifth incinerator in the Campania region: we needed it.
Below are the dumps (Ex quarry), all regional and the facilities are in the area of \u200b\u200bGiugliano.
Giugliano in Campania:
- farm dump pit;
- extension farm of a well Naples, Napoli 2, Napoli 3;
- landfill Slaves;
- landfill Novambiente;
- landfill Giuliani;
- landfill Resit Resit 1 and 2 ;
- landfill Settecainate;
- landfill Pozzolana Flegrea;
- former landfill quarry White;
- ecoballe temporary storage site for "Taverna del Re" since December 2005, her BEGINNING, has undergone four expansions and is still function;
- bordering with the site of the king's tavern there 'the temporary storage site of Villa Literno "The town often, today seized;
- 14 ecoballe platforms at the landfill in town Dell'Aversana Resit;
- 3 platforms ecoballe Giuliani at the landfill;
- 2 platforms at the landfill ecoballe Colonial shaft;
- CDR former production facility;
- gas turbine power plant;
- in the immediate border Pozzuoli purifier Cuma;

Villaricca:
- Alma landfill (landfill and this' between the territory of Villaricca and that of quality);
- Recount landfill, such as:
- landfill Maiuli;
- Alma landfill.

15 years of receivership in the town of Giugliano in Campania has hosted 15 million tonnes of waste from all over the Campania region in front of only 800 000 tonnes that the town of Giugliano produced in these 15 years.
scattered throughout the territory of Giugliano have been counted more than 30 small and medium-sized landfill of toxic and hazardous waste.
We apologize for any inaccuracies, but the list is' definitely now estimated to default and not to excess.

... and to make matters worse comes the incinerator!
collection and clearly waste separation and dry - wet not even talk about it!

Mutiplycation Chart 100x100

popular sovereignty referendum in Vicenza

is approaching the date of the referendum against the U.S. military base in Vicenza.
Referendum already opposed by Prodi, which took no account of popular demand, and now by Mr Berlusconi, who seriously considered inappropriate because the referendum could not relate the two matters of foreign policy and defense. But Berlusconi also has a friendship with Bush, that is with a character that the whole world has condemned as guilty of crimes against humanity, war that has caused the unjust treatment of prisoners. But first, here

involved other reasons:
1. One reason for homeland security, that the presence of a U.S. military base at stake, especially in these times of terrorism.
2. One reason for consistency with the Constitution that rejects war, and therefore also reject cooperation with those who wage war, the supply of land means that lead to war. This happens in Vicenza.

There is also the foundation of all the principle of popular sovereignty, which politicians willingly disregard, but rather must be the bearers and performers.
Any decision concerning a territory can not be taken except in accordance with the people occupying it. And the agreement must be first, not after. We have seen the error Scanzano, who led a revolt, and that of TAV in Valdisusa. And even in the complex issue of waste in Campania, the interview and the agreement should never be lacking, however, having eliminated the interference mafia.
Lecce, 29 September 2008